Wadi AlDawaser Solar Power Plant
Wadi AlDwaser PV Park, with a total capacity of (112) MW, is planned to be located in Wadi AlDwaser governorate within Riyadh region in the Kingdom of Saudi Arabia.
An official government website belonging to the Government of the Kingdom of Saudi Arabia
Wadi AlDwaser PV Park, with a total capacity of (112) MW, is planned to be located in Wadi AlDwaser governorate within Riyadh region in the Kingdom of Saudi Arabia.
Layla Solar PV Park, with a total capacity of (91) MW, is planned to be located in Al Aflaj governorate within Riyadh region in the Kingdom of Saudi Arabia.
Saad 2 Solar PV Park, with a total capacity of (1125) MW, is planned to be located in Saad within Riyadh region in the Kingdom of Saudi Arabia, with LCOE of 1.794 Cent/kWh.
Al Kahfa Solar PV, with a total capacity of (1425) MW, is planned to be located in the Central Region of the Kingdom of Saudi Arabia Saudi Arabia with LCOE of 1.769 Cent/kWh.
The Sudair solar project, with a total capacity of (1500) MW, is Saudi Arabia's largest solar power plant in the Kingdom, with an investment amount of US $924 million. The plant is located in Sudair industrial city, around Saudi Arabia's capital Riyadh.
Saad Solar PV Park, with a total capacity of (300) MW, is valued at around US $213 Million and located in Saad within Riyadh region in the Kingdom of Saudi Arabia
Ar Rass2 Solar PV Park, with a total capacity of (2000) MW, is planned to be located in Saudi Arabia Qassim province near Ar Rass city.
Al Shuaibah 1 & 2 Solar Photovoltaic Independent Power Plant, with a total capacity of (2631) MW and situated in the south area of Jeddah in Al Shuaibah, is one of the Kingdom's largest strides in renewable energy.
The Jeddah Solar project, with a total capacity of (300) MW, is located in Third Jeddah Industrial City, with an investment amount of US $227 million.
Rabigh Solar PV Park, with a total capacity of (400) MW, is located in Makkah region, Saudi Arabia. This project generated a total investment of US $201 million.
The Solar Power Plant will be located in Saudi Arabia Qassim province near Ar Rass city with a total capacity of (700) MW. The energy will be generated using bi-facial modules with tracking technology.
The Dumat Aljandal wind project is Saudi Arabia's first utility-scale wind farm and the largest in the Middle East. This project was awarded a world record-breaking tariff of US Cents 1.99/kWh, with an investment amount of US $415 million and with a total capacity of (400) MW. The plant is located at Al Jouf region of north-western Saudi Arabia.